This is a generic policy that can be used for several things, including agent rollout and uninstallation, and solution agent rollout, upgrade, and uninstallation.
Item | Description |
---|
Enable | Select to enable the policy. |
Name | Name of the policy. |
Description | Description of the policy. |
Package name | Specifies the package that is used by the policy. |
Program Name | Name of the program to run. The list of available options in the drop-down list depends on the package name. |
Applies to Collection | Specifies the collection to which the policy applies. Click the link to open the Collection Selector dialog. Note - At least one collection must be selected before the policy can be applied. |
Package Multicast Specifies the disabling of multicasting when downloading packages.
Scheduling Options - Manual | Select manual to run the policy manually and not according to a schedule. You can choose one or both of the following: Notify the user when this task is available - Select this to notify the user when this policy becomes available to run. The user can then control when to run the policy. Warn the user before running this task - Select this to warn the user before a policy is run. The user can then choose to cancel the task, run the task immediately, or be reminded later. |
Scheduling Options - Scheduled | Run the policy according to a schedule. Run the schedule as soon as possible and set up a schedule for it to be run. Choose one or more of the following: - Run once ASAP - Run the policy as soon as the package has been downloaded to the managed computer and the run conditions have been met. This option creates a mandatory policy that does not display a dialog on the managed computer before running.
- Schedule - Run the policy on a schedule. Click No schedule has been defined to open the Schedule Editor. Select one of the following:
- Only run at scheduled time - Instructs the Application Control Agent to run the policy only at the scheduled time. It will not attempt to queue and run the task after the scheduled time has past.
- Run as soon as possible after the scheduled time - Instructs the Application Control Agent that if it cannot run the task at the scheduled time it should continue to attempt to run it at a later time until it succeeds.
- User Can run - Permits the to user run the policy immediately when it becomes available.
- Notify user when the task is available - Notify the user when this policy becomes available to run. The user can then control when to run the policy.
- Warn before running - Warn the user before a policy is run. The user can then choose to cancel the task, run the task immediately, or defer the task.
|
Apply | Click to save changes. |
Cancel | Click to discard changes. |